Loading...
HomeMy WebLinkAbout1993-26 Site Plan Approval Parcel C Terramar Mayfair at ParklandRESOLUTION 93-26 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF PARKLAND, FLORIDA FOR SITE PLAN APPROVAL OF PARCEL C OF THE TERRAMAR TWO PLAT FOR MAYFAIR AT PARKLAND SUBDIVISION; CONSISTING OF 247 UNITS; CASE NO. 02 - SP -93. WHEREAS, at a regular meeting of the City Commission a Public Hearing was held to hear testimony for and against the petition of Mecca Farms, Inc. requesting site plan approval for Mayfair at Parkland subdivision. WHEREAS, the proposed site plan has been reviewed by the Planning and Zoning Board which voted 6-1 for approval. NOW, THEREFORE, be it resolved by the City Commission of the City of Parkland, Florida, that; The site plan of Parcel C of the Terramar Two plat is approved with the following conditions: 1. This approval is based on the following information: a. Site Plan prepared by QT Conceptual Design, containing one sheet dated received June 28, 1993. b. Preliminary Engineering Plans prepared by Carnahan -Proctor and Associates containing one sheet dated received June 28, 1993. c. Preliminary Landscaping Plans prepared by Nancy Butler, Landscape Architect, containing sheets L-1 thru and including L-9, which also includes landscaping for recreation area, entrance area, model row, as well as, signage on sheet L-9. The landscaping buffer shall include laurel oak, live oak, and a third tree to be determined by the Director of Planning and the Landscape/Code Officer. d. Preliminary Architectural Plans prepared by Miklos & Associates, Architects/Planners containing a cover sheet and 15 drawings which include site plans for gatehouse, temporary sales trailer, recreation area, and floor plans and elevations for models. RESOLUTION 93-26 PAGE 2 e. The plot plan for the proposed temporary sales center for Mayfair at Parkland prepared by Carnahan -Proctor and Associates, Inc., dated received August 4, 1993 by the City of Parkland. 2. The Developer shall provide one (1) fire hydrant at the entranceway on Hillsboro Blvd and two (2) fire hydrants along Loxahatchee Road with associated easements, in conformance with the Minimum Construction and Design Standards of the City of Parkland to be approved by the City Fire Inspector and the City Engineer. Plans for such improvements shall be reviewed and approved prior to the issuance of a Land Development Permit. 3. The Developer shall have completed the installation of all perimeter landscaping with irrigation. The landscape buffer areas along the complete length of Loxahatchee Road and Hillsboro Boulevard prior to the issuance of a certificate of occupancy for any single family home, other than the models and all landscaping shall be guaranteed for one year from the final landscape inspection by the City. 4. The Developer shall have all street trees and irrigation installed within thirty (30) days of the completion of each phase which has been approved and accepted for infrastructure improvements by the City Engineer. All landscaping shall be guaranteed for one year from the final landscaping inspection by the City. 5. The Developer shall have the recreation area, pool, dock, gazebo, and associated parking and landscaping as shown on sheet L-1 constructed in the first phase of development and shall be completed and have received a certificate of occupancy prior to issuance of a certificate of occupancy for any other single family home within the development other than the models. 6. The Developer shall supply to the City Attorney acceptable documentation which deeds to the Mayfair Homeowners Association, Lots 63 and 64, Block 4, as well as all buildings and improvements on said lots. This requirement shall be completed prior to the issuance of no more than 25 single family building permits other than the models. RESOLUTION 93 - 26 PAGE 3 7. The Petitioner shall provide a funds to be placed in an interest bearing account acceptable to the City Attorney in the amount of $20,000 for removal of the sales trailer to be returned to the Petitioner upon complete removal of the trailer and accessory parking and landscaping and the lot returned to a buildable condition. This condition shall be completed prior to the issuance of a building permit of the sales trailer. 8. The Developer shall provide, prior to the issuance of a building permit for the sales trailer, written approval from Broward County to access Hillsboro Blvd across the non -access line. 9. Prior to the issuance of a building permit for the temporary sales trailer, the City will require that the infrastructure plans for the Mayfair at Parkland subdivision be approved by the City Engineer and that all cost recovery and permit fees be paid. 10. Prior to the issuance of a building permit for the temporary sales trailer, the City will require that the Mayfair at Parkland subdivision be recorded in the official records of Broward County. 11. The entrance sign shall be illuminated. PASSED AND ADOPTED THIS 18TH DAY OF AUGUST , 1993. SAL PAGLIARA./' YOR SUSAN ARMSTRONG, C.M.( CITY CLERK